The city administration is intensifying measures to prepare the city for possible prolonged power supply disruptions. Practical checks of the emergency connection mechanism for mobile communication infrastructure have already been completed in nine districts of Kyiv.
Practical drills under real conditions
Valentin Mondryivskyi, Deputy Head of the Kyiv City State Administration, reported on the current state of preparations. According to him, the main goal of the initiative is to guarantee the availability of mobile connectivity for the capital's residents even during emergencies.
One of the key stages of the programme was the manoeuvres in Svityashynskyi district. Specialists carried out work during a scheduled power outage, which allowed them to test the connection mechanism under the most realistic conditions possible.
Joint work with municipal enterprises
The project is being implemented in cooperation with municipal enterprises "ShEU" and "UZN". During the drills, experts establish specific technical requirements, consider organisational aspects, and resolve other issues necessary for the operation of base stations in the event of prolonged power cuts.
The next site for such checks will be Desnyanskyi district, where similar practical sessions are planned.
Comments
No comments yet. Be the first!