
Verkhovna Rada passes law on legalisation and taxation of cryptocurrency market
Parliament approved document 10225-d, which defines the legal status of virtual assets and establishes a scale of tax rates.

Parliament approved document 10225-d, which defines the legal status of virtual assets and establishes a scale of tax rates.

Russian leader stated the need to develop the oil refining industry in eastern regions, citing security threats.

The teenager, who previously dreamed of resembling Marilyn Monroe, appeared in a female look during a professional photoshoot.

The document legalising crypto assets is ready for second reading after consensus was reached between the NBU and the NSSMCU.

Russia is enlisting citizens of Indonesia and the Philippines into its armed forces under the guise of civilian employment, offering up to $35,000 for signing a contract.

Rescuers officially noted that the power cable near Homiak Mountain may pose a potential danger to people in the event of insulation damage or moisture ingress.

Law enforcement officers identified new episodes of probable fictitious employment in the city's sports schools. Total budget losses are increasing, while the suspect has already returned to her post.

Servant of the People MP Margarita Shol collided with another car in a BMW not listed in her financial reports. She previously faced legal issues over inaccurate data.

The State Emergency Service of Ukraine has officially confirmed that a power electrical cable found within the territory of the Carpathian National Nature Park may be dangerous to people. This wire runs along a tourist route at the foot of Homiak Mountain, secured directly to the trunks of living trees. In some places, the cable lies on the ground and in the water.
Journalists who published video recordings of the violation noted that instead of standard utility poles to hold the wire, tree trunks are being used, and instead of reliable fastening, ordinary plastic ties are employed. The wire hangs at a height of approximately one and a half to two metres above the path, which is traversed by hundreds of tourists during the season. Some sections of the cable drop right under the feet of hikers or end up in the water.
The start of the line was traced to a sunken reinforced concrete structure located near the "Homiak Hat" hut. According to available information, this structure is used for fish farming. The cable runs approximately three hundred metres from the source from which, as journalists previously established, water tankers collected water for Bukovel hotels.
After the violation was discovered, the police were the first to arrive at the scene, to whom the journalists filed a report. Subsequently, specialists from Prykarpattiaoblenergo arrived at the location. Together with them, they traced the cable route, which led to a land plot with cadastral number 2611092001:22:002:0270. According to documents in the possession of the editorial office, this plot is associated with Bukovel LLC. However, according to the energy workers, they could not dismantle the line.
Appeals to the State Emergency Service also did not yield immediate results. A rescuer who arrived at the scene consulted with management by phone for a long time but could not even provide a pen and a sheet of paper to write a report on the dismantling. Visiting the unit also ended with phone negotiations without a decision being made. As a result, almost a whole day spent on calls and conversations did not lead to the removal of the dangerous wire.
Later, the State Emergency Service provided an official response. The document states that the power cable is laid through a forest area, attached to tree trunks in certain sections, and in some places lies on the ground, particularly near water bodies. The rescuers' conclusion reads as follows:
«Зазначені обставини, з огляду на наявність електричного кабелю, можуть створювати потенційну небезпеку для людей у разі пошкодження його ізоляції, потрапляння вологи, механічного пошкодження або інших несправностей» (The aforementioned circumstances, given the presence of an electrical cable, may create a potential danger to people in the event of damage to its insulation, moisture ingress, mechanical damage, or other malfunctions).
The editorial office sent a request to Bukovel LLC asking to clarify who owns the power line and on what basis it was laid among the trees of the national park.
According to preliminary legal qualification, such a line may fall under Article 91 of the Code of Administrative Offences — violation of rules for the protection and use of territories of the nature reserve fund. If intentional damage to protected territories is established, it concerns Article 252 of the Criminal Code. The final assessment must be given by the authorised bodies.
The discovered cable is only one of five findings regarding which journalists filed reports with law enforcement agencies. Regarding the reinforced concrete structure near the hut, the police opened a criminal case No. 12026091110000148 on 2 October 2026 under Part 4 of Article 197-1 of the Criminal Code of Ukraine (unauthorised construction).
The activities of the park itself were already inspected by the State Audit Service: for the period from November 2022 to January 2026, auditors established financial violations of almost 26 million hryvnia, among the officials mentioned was Stepan Hoshovskyi, the director of the Carpathian National Nature Park. Based on these materials, the State Bureau of Investigations launched an investigation under Part 4 of Article 191 of the Criminal Code as early as July, but the results are currently unknown.
Notably, Stepan Hoshovskyi and Deputy Minister of Economy and Environment Oleksandr Krasnolutskyi were present at the opening of the "Homiak Hat" hut in June 2026. Thus, the question is simple: did the officials see how the facility's utilities are arranged — and who will be held responsible if a tourist heading to Homiak steps on a damaged cable in the water?
Comments
No comments yet. Be the first!